Pre-Construction Checklist
1. Permits & Documentation
- Confirm Building permit issued
- Verify approved stamped plans on site
Confirm:
- Planning conditions of approval
- PW / Grading permits
- Encroachment permits
- Tree protection requirements
- Stormwater C3 requirements
- Inspection card process
- Deferred submittals (trusses, guardrails, windows, fire sprinklers, etc.)
- Special inspections list
2. Site Logistics & Setup
- Site access & staging area
- Neighbor protection plan
- Tree protection fencing installed
- Temporary power location
- Temporary water source
- Construction fencing & signage
- Porta-potty location
- Waste management / debris haul plan
- Dust control plan
- Noise hour compliance (city-specific)
3. Utility Coordination (Critical)
⚡ PG&E Coordination
- Service size (200A? 320A?)
- Panel location approved?
- Gas meter location approved?
- New service vs upgrade?
- Underground trench routing finalized?
- Temporary pole needed?
- Emergency disconnect per CEC 230.85 shown?
- Future solar busbar calculation (120% rule) confirmed?
- Transformer capacity check (if large home)
💧 Water
- Meter size confirmed?
- Backflow device required?
- Fire sprinkler separate meter?
- Utility trench separation verified?
🚽 Sewer
- Lateral verified?
- Cleanout locations confirmed?
- Depth checked vs foundation?
- Backwater valve required?
🌧 Drainage
- Site drainage plan
- Sump pump discharge location
- Roof drain routing
- Curb outlet permits?
4. Structural Coordination
- Foundation type confirmed: Mat? Pier? Spread footing?
- Rebar inspection sequence
- Hold-down locations marked?
- Shear wall locations field-marked?
- Anchor bolt layout reviewed?
- Steel beams ordered?
- Special moment frames lead time?
5. MEP Coordination
- HVAC system type confirmed:Heat pump? Furnace? Mini-split?
- Equipment locations for Condensers, Furnace / air handler
- AC unit setbacks verified (Planning compliance)
- Electrical panel schedule confirmed
- EV charger rough-in?
- Tankless location (vent clearances confirmed)
- Gas load calc (longest run method per CPC)
- Low voltage plan?
- Security / camera conduits?
6. Design & Finish Lock-In
- Exterior materials finalized?
- Window schedule confirmed?
- Door swings confirmed?
- Cabinet layouts frozen?
- Appliance specs provided?
- Lighting fixture responsibility clarified?
- Stair & railing design finalized?
- Waterproofing assemblies clarified?
- Deck & balcony details reviewed?
7. Flood / WUI / Special Conditions (If Applicable)
- Flood vents location verified?
- FFL elevation verified?
- WUI materials checklist confirmed?
- Garage flood panels?
- Emergency egress clear?
8. Schedule & Procurement
- Critical lead items ordered?
- Windows
- Trusses
- HVAC units
- Electrical gear
- Custom doors
- Rough construction schedule shared?
- Milestone payment schedule aligned?
- Inspection sequence clarified?